COST ESCALATION IN THE BUILDING INDUSTRY: IMPLICATION FOR EFFICIENT PROJECT DELIVERY
DOI:
https://doi.org/10.53555/nnmce.v9i3.1577Keywords:
cost escalation, building industry, project deliveryAbstract
Efficient project delivery is ubiquitous in the construction ecosystem. There is a growing concern about the effect of cost escalation in completing building projects in Nigeria. The current study assessed cost escalation in the building industry and the possible implication in project delivery. Ninety-eight professional engineers conveniently selected from building sites and other related venues completed a self-report instrument to ascertain the effect of cost escalation on a building project. The percentage scores of the data revealed that cost escalation contributes a large percentage of the delay in building projects (40.9%). The analysis also indicated that cost escalation contributes to the reduction in most building scope (33.4%) and accounts for the minimal implication relating to building project termination (24.5%).
References
Abubakar, M., Abdullahi, M., & Bala, K. (2018). Analysis of the causality links between the growth of the construction industry and the growth of the Nigerian economy. Journal of Construction in Developing Countries, 23(1). https://doi.org/10.21315/JCDC2018.23.1.6
Akinradewo, O., Aigbavboa, C., Aghimien, D., Oke, A., & Ogunbayo, B. (2021). The modular method of construction in developing countries: the underlying challenges. International Journal of Construction Management. https://doi.org/10.1080/15623599.2021.1970300
Al-Hamrani, A., Kim, D., Kucukvar, M., & Onat, N. C. (2021). Circular economy application for a Green Stadium construction towards sustainable FIFA world cup Qatar 2022TM. Environmental Impact Assessment Review, 87. https://doi.org/10.1016/j.eiar.2020.106543
Alaloul, W. S., Musarat, M. A., Rabbani, M. B. A., Iqbal, Q., Maqsoom, A., & Farooq, W. (2021). Construction sector contribution to economic stability: Malaysian GDP distribution. Sustainability (Switzerland), 13(9). https://doi.org/10.3390/su13095012
Amade, B., & Nwakanma, C. I. (2021). Identifying Challenges of Internet of Things on Construction Projects Using Fuzzy Approach. Journal of Engineering, Project, and Production Management, 11(3). https://doi.org/10.2478/jeppm-2021-0021
Amri, T. Al, & Marey-Pérez, M. (2020). Towards a sustainable construction industry: Delays and cost overrun causes in construction projects of Oman. Journal of Project Management. https://doi.org/10.5267/j.jpm.2020.1.001
Anerao, R. D. (2017). A review of progress and impact of health management information system (HMIS ) in the public health care system of India. MedPulse-International Medical Journal, 4(1).
Arum, C. I., Osunsanmi, T. O., & Aigbavboa, C. O. (2019). Appraisal of the Challenges Ensuring Occupational Health and Safety Compliance in the Nigerian Construction Industry. Modular and Offsite Construction (MOC) Summit Proceedings. https://doi.org/10.29173/mocs130
Babalola, O. D., Ibem, E. O., & Ezema, I. C. (2018). Assessment of awareness and adoption of lean practices in the Nigerian building industry. International Journal of Civil Engineering and Technology, 9(13).
Benachio, G. L. F., Freitas, M. do C. D., & Tavares, S. F. (2020). Circular economy in the construction industry: A systematic literature review. In Journal of Cleaner Production (Vol. 260). https://doi.org/10.1016/j.jclepro.2020.121046
Bhatia, D., & R Apte, E. M. (2016). Schedule Overrun and Cost Overrun in the Construction of Private Residential Construction Project: Case Study of Pune India. International Journal of Technical Research and Applications, 4(2).
Boateng, A., Ameyaw, C., & Mensah, S. (2020). Assessment of systematic risk management practices on building construction projects in Ghana. International Journal of Construction Management. https://doi.org/10.1080/15623599.2020.1842962
Chulkov, D. V. (2009). De-Escalation of Commitment in MIS Projects: The Implications of Three Economic Theories. Project Management Journal, 9(1).
Dorcas, B., Elkanah, O., & John, O. (2019). Most Critical Factors Responsible For Poor Project Quality Performance in Building Construction Industry (A Case Study of Three Major Cities in Nigeria). European International Journal of Science and Technology, 8(2).
Ejaz, N., Ali, I., & Tahir, M. (2013). Assessment of Delays and Cost Overruns during Construction Projects in Pakistan. Civil Engineering Department University of Engineering & Technology, Taxila – Pakistan Abstract.
Ejaz, N., Khan, D., Naeem, U. A., & Elahi, A. (2011). Causes of delay and cost overruns during construction projects in developing countries: A case study of Pakistan. Journal of Engineering and Applied Sciences, 30(1).
Ezeokoli, F. O., Bert-Okonkwor, C. B. N., Okongwu, Mi. I., Fadumo, D. O., Ohaedeghasi, C. I., & Okoye, N. M. (2021). Factors Confronting the Present-Day Construction Practices in South-East, Nigeria: The Professionals' View. Journal of Building Construction and Planning Research, 09(02). https://doi.org/10.4236/jbcpr.2021.92011
Gebrel, M., Assaf, K. A., Atef, A., & Awad, M. (2021). Causes of delay and cost overrun for educational building projects in Egypt. JES. Journal of Engineering Sciences, 0(0). https://doi.org/10.21608/jesaun.2021.69258.1044
Gil, N., & Fu, Y. (2022). Megaproject Performance, Value Creation, and Value Distribution: An Organizational Governance Perspective. Academy of Management Discoveries, 8(2). https://doi.org/10.5465/amd.2020.0029
Iheme, C. C., Ngwu, C., Okoro, C., Oyoyo, E., & Iroegbu, A. N. (2011). Problems of the construction industry in Nigeria. Journal of Academic Excellence, 5(1).
Ikechukwu, A. C., Emoh, F. I., & Kelvin, O. A. (2017). Causes and Effects of Cost Overruns in Public Building Construction Projects Delivery, In Imo State, Nigeria. IOSR Journal of Business and Management, 19(07). https://doi.org/10.9790/487x-1907021320
Khanal, B. P., & Ojha, S. K. (2020). Cause of time and cost overruns in the construction project in Nepal. Advances in Science, Technology and Engineering Systems, 5(4). https://doi.org/10.25046/aj050423
Liu, C., & He, S. (2016).Input–output structures of the Australian construction industry. Construction Economics and Building, 16(2). https://doi.org/10.5130/AJCEB.v16i2.4819
Maran, R., Rajendran, S., & Kalidindi, S. (2011). Material cost and escalation clauses in Indian construction contracts. Proceedings of Institution of Civil Engineers: Construction Materials, 164(2). https://doi.org/10.1680/coma.900036
Mudi, A., Bioku, J. O., & Kolawole, O. B. (2015). Assessing the Characteristics of Nigerian Construction Industry in Infrastructure Development. International Journal of Engineering Research & Technology (IJERT), 4(11).
Muhammad, N. Z., Keyvanfar, A., Majid, M. Z. A., Shafaghat, A., Magana, A. M., Lawan, H., & Balubaid, S. (2015). Assessment of cost escalation factors for building and civil engineering projects in the Nigerian construction industry: A multiple regression approach. Jurnal Teknologi, 74(4). https://doi.org/10.11113/jt.v74.4614
Nazif, A., Mustapha, A. K., & Sani, F. (2021). An assessment of cost escalation in building construction projects. Nigerian Journal of Technology, 39(4). https://doi.org/10.4314/njt.v39i4.8
Oduola, R. O. (2010). Poor quality concrete: A major challenge in the building construction industry in Nigeria. Structures and Architecture - Proceedings of the 1st International Conference on Structures and Architecture, ICSA 2010.
Ogunmakinde, O. E., Sher, W., & Maund, K. (2019). Challenges of the Nigerian Construction Industry?: A Systematic Review. Forum of Young Researchers in Sustainable Building, 1.
Ogunsanya, O. A., Aigbavboa, C. O., Thwala, D. W., & Edwards, D. J. (2022). Barriers to sustainable procurement in the Nigerian construction industry: an exploratory factor analysis. International Journal of Construction Management, 22(5). https://doi.org/10.1080/15623599.2019.1658697
Okafor, C. C., Ani, U. S., & Ugwu, O. (2022). Evaluation of Supply Chain Management Lapses in Nigeria's Construction Industry. International Journal of Construction Education and Research, 18(2). https://doi.org/10.1080/15578771.2020.1869122
Oke, A. E., Arowoiya, V. A., & Akomolafe, O. T. (2022). An empirical study on challenges to the adoption of the Internet of Things in the Nigerian construction industry. African Journal of Science, Technology, Innovation, and Development, 14(1). https://doi.org/10.1080/20421338.2020.1819117
Oladinrin, T., Ogunsemi, D., & Aje, I. (2012). Role of Construction Sector in Economic Growth: Empirical Evidence from Nigeria. FUTY Journal of the Environment, 7(1). https://doi.org/10.4314/fje.v7i1.4
Rashed, E. F., & Shaqour, E. N. (2014). Factors causing cost overrun in administrative construction projects in Egypt. Journal of Engineering and Applied Science, 61(3).
Sa’eed, A., Gambo, N., Inuwa, I. I., & Musonda, I. (2020). Effects of financial management practices on the technical performance of building contractors in northeast Nigeria. Journal of Financial Management of Property and Construction, 25(2). https://doi.org/10.1108/JFMPC-07-2019-0064
Shibani, A., Mahadel, O., Hassan, D., Agha, A., & Saidani, M. (2021). Causes of time overruns in the construction industry in Egypt. International Research Journal of Modernization in Engineering Technology and Science, 3(1).
Sholanke, A. B., Chen, S. J., Newo, A. A., & Nwabufo, C. B. (2019). Prospects and challenges of lean construction practice in the building industry in Nigeria: Architects' perspective. International Journal of Innovative Technology and Exploring Engineering, 8(8).
Published
Issue
Section
License
Copyright (c) 2023 Journal of Advance Research in Mechanical & Civil Engineering
This work is licensed under a Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.
Terms & Condition
Submission -
Author can submit the manuscript through our online submission process or email us at the designated email id in contact details.
The other mode of submission not accepted than online and email.
Before submission please read the submission guidelines.
NN Publication accepts only article submitted in pdf/doc/docx/rtf file format. Another format except given file formats will no be considered .
Author will be responsible for the error mistakes in the submission files. The minor changes can be done without any cost after publication. But for major changes NN Publication may charges you the editing charges.
Publication (Online) -
The online publication is scheduled on last date of every month, but it can be delayed by 24 to 48 hours due to editorial process if huge number of articles comes to publish in single issue.
Automatic notificatation email will be sent to the all users on publication of an issue, so its author’s duty to check their email inbox or SPAM folder to get this notification.
After publication of article author can not withdraw their article.
If editor’s found any issue after publication of article then the NN Publication have the authority to remove the article from online website.
No refund will be provided after online publication of article.
Publication (Print) -
The print copy publication are sent as per the author’s request after 2 weeks of online publication of that issue.
NN Publication will ship the article by India Post and provide the consignment number on dispatch of print copy.
NN Publication follows all the guidelines of delivery provided by IndiaPost and hence not responsible for delay in delivery due to any kind of reasons.
Refund of hard copy will not be provided after dispatch or print of the journal.
NN Publication will be responsible for raise a complain if there is any issue occurs in delivery, but still will not be responsible for providing the refund.
NN Publication will be responsible to resend the print copy only and only if the print copy is lost or print copy is damaged in delivery / or there is delay more than 6 months.
According to India Post the delivery should be completed with in 1-3 weeks after dispatch of articles.
Privacy Policy-
NN Publicationl uses the email ids of authors and editors and readers for sending editorial or publication notification only, we do not reveal or sell the email ids to any other website or company.